HESCO ENC Services
HESCO handles new connections, change applications, and demand notices for Hyderabad, Nawabshah, Mirpurkhas and the surrounding districts — this hub links every ENC portal task to its dedicated tool below. HESCO's territory centers on urban Hyderabad and Nawabshah/Shaheed Benazirabad, with Mirpurkhas, Badin, and Tando Adam covering Sindh's cotton- and rice-growing interior — new connections in the coastal/canal-belt districts more often carry agricultural tube-well load alongside domestic demand than the more purely residential Hyderabad city grid.
Track Application
Track your HESCO connection application status using your Tracking ID or CNIC.
Apply — New Connection
Submit a new HESCO electricity connection application online.
Change of Name / Tariff / Load
Apply for a change of name, tariff, or load on an existing HESCO connection.
Print Demand Notice
Print your HESCO Demand Notice using your Tracking ID.
Print Application Form
Download and print your submitted application form.
Upload Paid Notice
Upload your paid Demand Notice bank receipt to proceed.
About Hyderabad Electric Supply Company
Hyderabad, Nawabshah, Mirpurkhas, Badin, Tando Adam, Shaheed Benazirabad
022-111-786-786
Documents Required for New Connection
- ✓Property Document Copy
- ✓Attested CNIC Copy of Applicant
- ✓Attested CNIC Copy of Witness
- ✓Neighbour Electricity Bill Copy
- ✓Wiring Contractor's Test Report
Frequently Asked Questions
Which HESCO service do I need — new connection, tracking, or a demand notice tool?
Use the service cards above: 'Apply — New Connection' for a fresh meter, 'Track Application' if you already have a Tracking ID or CNIC, and the demand notice tools once you've received your DN. Most first-time visitors start with 'Apply — New Connection'.
Do I need a Tracking ID or is CNIC enough to check my HESCO status here?
Either works. The 'HESCO Track Application' card above accepts your 11-digit Tracking ID or your 13-digit CNIC (no dashes) — CNIC is useful if you've misplaced the Tracking ID SMS, since it pulls up every application filed under that identity number.
What's the minimum paperwork to start a HESCO application from this page?
Before opening any of the cards above, have these five ready: (1) Property Document Copy, (2) Attested CNIC Copy of Applicant, (3) Attested CNIC Copy of Witness, (4) Neighbour Electricity Bill Copy, (5) Wiring Contractor's Test Report — all attested copies, not self-signed ones.
I got a HESCO Demand Notice — which tool on this page do I use next?
Use 'Print Demand Notice' to get a clean printable copy, pay it at any listed bank, then use 'Upload Paid Notice' to submit the bank receipt. Uploading the receipt (rather than waiting for the bank to report it) is what actually moves your application to the next stage.
Who do I call if a service on this HESCO hub page isn't working as expected?
Call HESCO customer care at 022-111-786-786 — quote your Tracking ID if you have one. For portal or tool-specific issues on CheckBills.net itself, the individual service pages linked above have more detailed troubleshooting.