HAZECO ENC Services
HAZECO handles new connections, change applications, and demand notices for Abbottabad, Mansehra, Haripur and the surrounding districts — this hub links every ENC portal task to its dedicated tool below. HAZECO is the only DISCO covering entirely hilly/mountainous terrain — Abbottabad, Mansehra, Haripur, Battagram, and Kohistan sit in the Hazara division's foothills and mountains, so pole placement and cable routing on steep ground is a bigger factor in survey outcomes here than on almost any other DISCO's network.
Track Application
Track your HAZECO connection application status using your Tracking ID or CNIC.
Apply — New Connection
Submit a new HAZECO electricity connection application online.
Change of Name / Tariff / Load
Apply for a change of name, tariff, or load on an existing HAZECO connection.
Print Demand Notice
Print your HAZECO Demand Notice using your Tracking ID.
Print Application Form
Download and print your submitted application form.
Upload Paid Notice
Upload your paid Demand Notice bank receipt to proceed.
About Hazara Electric Supply Company
Abbottabad, Mansehra, Haripur, Battagram, Kohistan, Tor Ghar
0992-386100
Documents Required for New Connection
- ✓Property Document Copy
- ✓Attested CNIC Copy of Applicant
- ✓Attested CNIC Copy of Witness
- ✓Neighbour Electricity Bill Copy
- ✓Wiring Contractor's Test Report
Frequently Asked Questions
Which HAZECO service do I need — new connection, tracking, or a demand notice tool?
Use the service cards above: 'Apply — New Connection' for a fresh meter, 'Track Application' if you already have a Tracking ID or CNIC, and the demand notice tools once you've received your DN. Most first-time visitors start with 'Apply — New Connection'.
Do I need a Tracking ID or is CNIC enough to check my HAZECO status here?
Either works. The 'HAZECO Track Application' card above accepts your 11-digit Tracking ID or your 13-digit CNIC (no dashes) — CNIC is useful if you've misplaced the Tracking ID SMS, since it pulls up every application filed under that identity number.
What's the minimum paperwork to start a HAZECO application from this page?
Before opening any of the cards above, have these five ready: (1) Property Document Copy, (2) Attested CNIC Copy of Applicant, (3) Attested CNIC Copy of Witness, (4) Neighbour Electricity Bill Copy, (5) Wiring Contractor's Test Report — all attested copies, not self-signed ones.
I got a HAZECO Demand Notice — which tool on this page do I use next?
Use 'Print Demand Notice' to get a clean printable copy, pay it at any listed bank, then use 'Upload Paid Notice' to submit the bank receipt. Uploading the receipt (rather than waiting for the bank to report it) is what actually moves your application to the next stage.
Who do I call if a service on this HAZECO hub page isn't working as expected?
Call HAZECO customer care at 0992-386100 — quote your Tracking ID if you have one. For portal or tool-specific issues on CheckBills.net itself, the individual service pages linked above have more detailed troubleshooting.