GEPCO ENC Services
GEPCO handles new connections, change applications, and demand notices for Gujranwala, Sialkot, Gujrat and the surrounding districts — this hub links every ENC portal task to its dedicated tool below. GEPCO's territory covers export-manufacturing cities — Gujranwala's steel and cookware industry, Sialkot's sporting-goods and surgical-instrument exporters — alongside the more agricultural districts of Hafizabad, Mandi Bahauddin, and Narowal, so commercial/industrial three-phase applications are common in the two main cities while rural feeders serve the smaller towns.
Track Application
Track your GEPCO connection application status using your Tracking ID or CNIC.
Apply — New Connection
Submit a new GEPCO electricity connection application online.
Change of Name / Tariff / Load
Apply for a change of name, tariff, or load on an existing GEPCO connection.
Print Demand Notice
Print your GEPCO Demand Notice using your Tracking ID.
Print Application Form
Download and print your submitted application form.
Upload Paid Notice
Upload your paid Demand Notice bank receipt to proceed.
About Gujranwala Electric Power Company
Gujranwala, Sialkot, Gujrat, Hafizabad, Mandi Bahauddin, Narowal
111-000-786
Documents Required for New Connection
- ✓Property Document Copy
- ✓Attested CNIC Copy of Applicant
- ✓Attested CNIC Copy of Witness
- ✓Neighbour Electricity Bill Copy
- ✓Wiring Contractor's Test Report
Frequently Asked Questions
Which GEPCO service do I need — new connection, tracking, or a demand notice tool?
Use the service cards above: 'Apply — New Connection' for a fresh meter, 'Track Application' if you already have a Tracking ID or CNIC, and the demand notice tools once you've received your DN. Most first-time visitors start with 'Apply — New Connection'.
Do I need a Tracking ID or is CNIC enough to check my GEPCO status here?
Either works. The 'GEPCO Track Application' card above accepts your 11-digit Tracking ID or your 13-digit CNIC (no dashes) — CNIC is useful if you've misplaced the Tracking ID SMS, since it pulls up every application filed under that identity number.
What's the minimum paperwork to start a GEPCO application from this page?
Before opening any of the cards above, have these five ready: (1) Property Document Copy, (2) Attested CNIC Copy of Applicant, (3) Attested CNIC Copy of Witness, (4) Neighbour Electricity Bill Copy, (5) Wiring Contractor's Test Report — all attested copies, not self-signed ones.
I got a GEPCO Demand Notice — which tool on this page do I use next?
Use 'Print Demand Notice' to get a clean printable copy, pay it at any listed bank, then use 'Upload Paid Notice' to submit the bank receipt. Uploading the receipt (rather than waiting for the bank to report it) is what actually moves your application to the next stage.
Who do I call if a service on this GEPCO hub page isn't working as expected?
Call GEPCO customer care at 111-000-786 — quote your Tracking ID if you have one. For portal or tool-specific issues on CheckBills.net itself, the individual service pages linked above have more detailed troubleshooting.